February 15, 2006

The worst is over...

Dust and demolition being the worst...

I believe I am finished the lathe and plaster removal of the "log room".  This last weekend I took just under 2500lbs of plaster and 3 truckloads of lathe to the dump.  Today I removed the old knob/tube wiring and doubled the entry way to what was the "log room" and will eventually be a game room of sorts.   This weekend I will support and rough in the opening propperly.

The next steps...

With this room gutted I can feed 240V to a bedroom on the second floor which is without heat.  Following that I will wire this room, throw some insulation around, and throw some drywall up.  As well a front window will go in, approx 68" x 88".

Still not sure what I am going to do with the floors.  It's real tempting to rip the plywood sub floor up and install a hardwood of some sort.  If we don't do that it will be a lamitate product.

Leigh

 

Check out Houseblogs!
Posted by Brain Radio at 02:26:17 | Permanent Link | Comments (1) |
Comments
1 - I would install the hardwood over the subfloor. Especially if it's concrete under the subfloor. We're doing laminate over concrete in our basement (we're using a vapour barrier), I know it's a bad idea, we need the headroom though. (Comment this)

Written by: Derek at 2006/02/15 - 19:56:29