The worst is over...
Dust and demolition being the worst...
I believe I am finished the lathe and plaster removal of the "log room". This last weekend I took just under 2500lbs of plaster and 3 truckloads of lathe to the dump. Today I removed the old knob/tube wiring and doubled the entry way to what was the "log room" and will eventually be a game room of sorts. This weekend I will support and rough in the opening propperly.

The next steps...
With this room gutted I can feed 240V to a bedroom on the second floor which is without heat. Following that I will wire this room, throw some insulation around, and throw some drywall up. As well a front window will go in, approx 68" x 88".
Still not sure what I am going to do with the floors. It's real tempting to rip the plywood sub floor up and install a hardwood of some sort. If we don't do that it will be a lamitate product.
Leigh